Plan a sprint with capacity estimation, story selection, dependency mapping, and risk identificat…
⚡ Productivity skills By phuryn Version v1.0.0 Added 2026-09-03 Updated 2026-09-03 Source ↗
8.0Overall rating
1Views
4Downloads
26.0kStars

Installation

🤖 Install via AI

Copy the prompt below and send it to your AI assistant (e.g. Claude Code) — it will follow the instructions and install automatically.

Install the "sprint-plan" skill by following the instructions at https://skill123.me/install/sprint-plan.
⌨️ Command line install

Run in your terminal — downloads and installs to ~/.claude/skills/.

curl -fsSL https://skill123.me/install/sprint-plan.sh | bash
📦 Download ZIP

Download the zip and extract it into your skills directory (e.g. ~/.claude/skills/), then restart your session.

⬇ Download v1.0.0 · 1 KB
📊 Static rating
8.0/10
Trigger
7.0
Structure
8.0
Workflow
6.8
Content
9.0
Engineering
9.0
Security
9.5

Six-dimension rubric with reviewer rationale.

View scorecard ↓
🛡 Dynamic test
—

Not live-tested yet — this skill is rated on static analysis only.

About this skill

Plan a sprint with capacity estimation, story selection, dependency mapping, and risk identification. Use when preparing for sprint planning, estimating team capacity, selecting stories, or balancing sprint scope against velocity.

Documentation

Plan a sprint with capacity estimation, story selection, dependency mapping, and risk identification. Use when preparing for sprint planning, estimating team capacity, selecting stories, or balancing sprint scope against velocity.

Sprint Planning

Plan a sprint by estimating team capacity, selecting and sequencing stories, and identifying risks.

### Context

You are helping plan a sprint for **$ARGUMENTS**.

If the user provides files (backlogs, velocity data, team rosters, or previous sprint reports), read them first.

### Instructions

1. **Estimate team capacity**:

  • Number of team members and their availability (PTO, meetings, on-call)
  • Historical velocity (average story points per sprint from last 3 sprints)
  • Capacity buffer: reserve 15-20% for unexpected work, bugs, and tech debt
  • Calculate available capacity in story points or ideal hours

2. **Review and select stories**:

  • Pull from the prioritized backlog (highest priority first)
  • Verify each story meets the Definition of Ready (clear AC, estimated, no blockers)
  • Flag stories that need refinement before committing
  • Stop adding stories when capacity is reached

3. **Map dependencies**:

  • Identify stories that depend on other stories or external teams
  • Sequence dependent stories appropriately
  • Flag external dependencies and owners
  • Identify the critical path

4. **Identify risks and mitigations**:

  • Stories with high uncertainty or complexity
  • External dependencies that could slip
  • Knowledge concentration (only one person can do it)
  • Suggest mitigations for each risk

5. **Create the sprint plan summary**:


   Sprint Goal: [One sentence describing what success looks like]
   Duration: [2 weeks / 1 week / etc.]
   Team Capacity: [X story points]
   Committed Stories: [Y story points across Z stories]
   Buffer: [remaining capacity]

   Stories:
   1. [Story title] — [points] — [owner] — [dependencies]
   ...

   Risks:
   - [Risk] → [Mitigation]

6. **Define the sprint goal**: A single, clear sentence that captures the sprint's primary value delivery.

Think step by step. Save as markdown.

---

### Further Reading

Score breakdown

Trigger
7.0
Description covers What and four When phrasings around capacity and scope; no When-Not and no Chinese keywords.
Structure
8.0
67-line single file; steps and summary template inline; body starts at H2; no extra files.
Workflow
6.8
Six steps with 15-20 percent buffer rule, DoR verification gate, capacity stop rule, critical-path and risk mitigation guidance.
Content
9.0
Imperative bullet steps with concrete numbers; template is directly fillable; no filler.
Engineering
9.0
Valid frontmatter; no scripts; single credible external link; no broken references.
Security
9.5
No scripts, network calls, secrets, or injection; benign planning content.
Clear sprint-planning procedure with capacity buffer math, Definition-of-Ready gate, dependency and risk mapping; trigger lacks exclusions.